Adviser Meeting with Dr. Frank 2-3-2012
- Held biweekly on Fridays at 12:30PM
- Meeting will always be on the same week as our meeting with Dr. Harvey
- We may need to purchase a another type of control board for the computer vision
- The beagle board may not have enough processing power/speed
- Another possible cause of the problem could be opencv compatibility with the beagle board
- Midterm Hardware Demo. Feb. 23, 2012
- The more done we have done and are capable of demonstrating the better
- It was suggested that our next milestone should be to have the vehicle in the water equipped with the thrusters and testing
- Possible Test for Camera
- Small light refraction test with a laser pointer
- Performed underwater and used to determine the angle of refraction on the viewing wall of the enclosure
- For Presentation
- Dr. Frank will like to see more software architecture, different modules and flow chart diagrams
- He feels as though we're at the stage in our project where should have a lot of code developed therefore a better understanding of how the vehicle will operate
No comments:
Post a Comment